Brent GudgeonApr 161 min readApril 16, 2024 Thermfire Work Continues! Thermfires move from the fab shop to our assembly area. (above) Chris assembling a water pump and filter assembly for a Thermfire System.(above) Ancillary equipment sand hoppers painted and fitted with valves and level probes.
Thermfires move from the fab shop to our assembly area. (above) Chris assembling a water pump and filter assembly for a Thermfire System.(above) Ancillary equipment sand hoppers painted and fitted with valves and level probes.
Comments