top of page
  • Writer's pictureBrent Gudgeon

April 16, 2024 Thermfire Work Continues!

Thermfires move from the fab shop to our assembly area.


(above) Chris assembling a water pump and filter assembly for a Thermfire System.

(above) Ancillary equipment sand hoppers painted and fitted with valves and level probes.

15 views0 comments
bottom of page